Construction
5P468-26-0011/A Stage 2 - Johnston Canyon Rock Slope Remediation, Banff National Park
5P468-26-0011/A Stage 2- Johnston Canyon Rock Slope Remediation, Banff National Park REQUIREMENT Parks Canada Agency requires the services of a qualified contractor to complete rock slope remediation work along the Johnston Canyon Trail in Banff National Park. The work is part of Parks Canada’s ongoing rockfall hazard management that is intended to reduce the potential safety hazards along the busy trail which runs through the narrow, vertical walled canyon. The work will be situated in a remote environment with significant access and logistical constraints. The scope of work inclu...
AI Summary
Opportunity Overview
5P468-26-0011/A Stage 2- Johnston Canyon Rock Slope Remediation, Banff National Park REQUIREMENT Parks Canada Agency requires the services of a qualified contractor to complete rock slope remediation work along the Johnston Canyon Trail in Banff National Park. The work is part of Parks Canada’s ongoing rockfall hazard management that is intended to reduce the potential safety hazards along the busy trail which runs through the narrow, vertical walled canyon. The work will be situated in a remote environment with significant access and logistical constraints. The scope of work inclu...
Key Requirements
- Review source documents for extracted requirements.
Aug 20, 2026
20 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro