Services
Alberta Electric System Operator - Request for Proposal - Functional Specification Revisions for EATL/WATL HVDC Protection and Controls Upgrade
The AESO is seeking consultant(s) for a period of 6 months. Services include but are not limited to: (a) Review the original 2011 FS for two High Voltage Direct Current (“HVDC”) control system replacement projects in Alberta; (b) Identify a high-level list of items within the FS that will need to change due to system conditions, project scope, and proposed enhancements; (c) Identify any additional enhancements or...
Source Summary
Opportunity Overview
The AESO is seeking consultant(s) for a period of 6 months. Services include but are not limited to: (a) Review the original 2011 FS for two High Voltage Direct Current (“HVDC”) control system replacement projects in Alberta; (b) Identify a high-level list of items within the FS that will need to change due to system conditions, project scope, and proposed enhancements; (c) Identify any additional enhancements or...
Key Requirements
- Review source documents for extracted requirements.
Nov 16, 2026
33 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro