Construction
City of Calgary - Request for Proposal - RFP 26-1618 Shepard to Bow Package
The planned Shepard to Bow construction package spans from Shepard Station(Sta 100+000) to the future Ogden Bridge (Sta 111+700), excludes the Barlow Trail Bridge segment (Sta 101+900 to Sta 102+850). (Proponents are to note, a discontinuity in chainage exists between (Sta 108+100 and Sta 110+000).
Source Summary
Opportunity Overview
The planned Shepard to Bow construction package spans from Shepard Station(Sta 100+000) to the future Ogden Bridge (Sta 111+700), excludes the Barlow Trail Bridge segment (Sta 101+900 to Sta 102+850). (Proponents are to note, a discontinuity in chainage exists between (Sta 108+100 and Sta 110+000).
Key Requirements
- This opportunity is available by invitation only to vendors who were prequalified under RFPQ 25-053.
Nov 19, 2026
57 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro