Construction
City of Lloydminster - Invitation to Bid - Old City Shop - Site Reclamation
The Work generally comprises of: The loading, hauling, and disposing of hydrocarbon and salt impacted soils. The impacted soils disposal location shall be determined by the Contractor. Following the disposal of the impacted soils, the Work will include the placement of Owner supplied clay fill, earthworks grading, and the supply and installation of a storm water pumping station and associated appurtenances including connecting the pumping station to power and commissioning the system. The storm water pumping station will be connected to the City of Lloydminster storm sewer system within 49...
AI Summary
Opportunity Overview
The Work generally comprises of: The loading, hauling, and disposing of hydrocarbon and salt impacted soils. The impacted soils disposal location shall be determined by the Contractor. Following the disposal of the impacted soils, the Work will include the placement of Owner supplied clay fill, earthworks grading, and the supply and installation of a storm water pumping station and associated appurtenances including connecting the pumping station to power and commissioning the system. The storm water pumping station will be connected to the City of Lloydminster storm sewer system within 49...
Key Requirements
- Review source documents for extracted requirements.
Aug 27, 2026
27 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro