Skip to main content
Back to RFP search

Construction

Design, Supply and Installation of 15 kV Arc-Resistant Switchgear

NB Power requires the design, supply, and installation of 15 kV class arc-resistant switchgear and an E-house at the Gordon Road Substation in Miramichi, New Brunswick. The project involves electrical infrastructure upgrades with specific technical and compliance requirements.

Open to all suppliers
Ref: 6412-26-S577

AI Summary

Opportunity Overview

NB Power requires the design, supply, and installation of 15 kV class arc-resistant switchgear and an E-house at the Gordon Road Substation in Miramichi, New Brunswick. The project involves electrical infrastructure upgrades with specific technical and compliance requirements.

Key Requirements

  • Design of arc-resistant switchgear
  • Supply of E-house
  • Installation at substation
  • Compliance with Euna Procurement platform
Closing Deadline

Sep 22, 2026

16 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro