Design, Supply and Installation of 15 kV Arc-Resistant Switchgear
NB Power requires the design, supply, and installation of 15 kV class arc-resistant switchgear and an E-house at the Gordon Road Substation in Miramichi, New Brunswick. The project involves electrical infrastructure upgrades with specific technical and compliance requirements.
AI Summary
Opportunity Overview
NB Power requires the design, supply, and installation of 15 kV class arc-resistant switchgear and an E-house at the Gordon Road Substation in Miramichi, New Brunswick. The project involves electrical infrastructure upgrades with specific technical and compliance requirements.
Key Requirements
- Design of arc-resistant switchgear
- Supply of E-house
- Installation at substation
- Compliance with Euna Procurement platform
Sep 22, 2026
16 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro