Public sector
East Perimeter Office (EPO) South Door/Entrance - Bituminous Pad Repair
Mobilization Mobilization shall include assembling, transporting and setting up of the Contractor’s equipment, tools and supplies necessary for the work and for moving all items away when the project is completed. Traffic Control Traffic Control shall include men and equipment signage and flaggers, and as determined by the Contract Administrator. Bituminous Pad Repair The project involves repair of an...
Source Summary
Opportunity Overview
Mobilization Mobilization shall include assembling, transporting and setting up of the Contractor’s equipment, tools and supplies necessary for the work and for moving all items away when the project is completed. Traffic Control Traffic Control shall include men and equipment signage and flaggers, and as determined by the Contract Administrator. Bituminous Pad Repair The project involves repair of an...
Key Requirements
- Review source documents for extracted requirements.
Oct 27, 2026
13 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro