Goods
CCGS John P. Tully Water Maker Supply
The Canadian Coast Guard requires two reverse osmosis water makers to be supplied and installed on the CCGS John P. Tully. The equipment must be delivered to Sidney, BC by October 31, 2027, with a 3-year contract including options for additional units.
AI Summary
Opportunity Overview
The Canadian Coast Guard requires two reverse osmosis water makers to be supplied and installed on the CCGS John P. Tully. The equipment must be delivered to Sidney, BC by October 31, 2027, with a 3-year contract including options for additional units.
Key Requirements
- Supply and install two reverse osmosis water makers
- Deliver to Sidney, BC by October 31, 2027
Nov 20, 2026
16 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro