Construction
Forestry and Parks - Invitation to Bid - Miquelon Lake Provincial Park, Wastewater and Distribution System Refurbishment
Work of this Contract comprises the following: .1 Miquelon Lake Provincial Park, various projects including: .1 Schedule 1 - Lift Station #1 - Main Lift Station VFD Conversion .1 Installation of electrical equipment for VFD conversion. .2 Schedule 2 - Lift Station #2 - Boat Launch Lift Station Replacement .1 Removal and disposal of the existing lift station equipment and pumps. .2 CCTV Inspection of the existing...
Source Summary
Opportunity Overview
Work of this Contract comprises the following: .1 Miquelon Lake Provincial Park, various projects including: .1 Schedule 1 - Lift Station #1 - Main Lift Station VFD Conversion .1 Installation of electrical equipment for VFD conversion. .2 Schedule 2 - Lift Station #2 - Boat Launch Lift Station Replacement .1 Removal and disposal of the existing lift station equipment and pumps. .2 CCTV Inspection of the existing...
Key Requirements
- .1 Safety certification, as specified in Section 00 21 13 - Instructions to Bidders, is a condition of contract award.
- .2 The Contractor shall maintain a valid standard COR, SECOR, COREL, or TLC for the duration of the Work of this Contract.
Oct 15, 2026
23 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro