Skip to main content
Back to RFP search

Construction

Forestry and Parks - Invitation to Bid - Staff Residence Basement Repairs - Sir Winston Churchill Provincial Park

PROJECT BACKGROUND: Sir Winston Churchill Provincial Park is located approximately 11km from the community of Lac La Biche. The park includes 72 campsites, comfort camping cabins, and a reservable community facility. The basement level of the staff residence building was stripped down to bare studs following a flood in 2024. As a result, two staff bedrooms have been removed from service. PROJECT OBJECTIVE: This...

Open to all suppliers
Ref: AB-2026-06527

Source Summary

Opportunity Overview

PROJECT BACKGROUND: Sir Winston Churchill Provincial Park is located approximately 11km from the community of Lac La Biche. The park includes 72 campsites, comfort camping cabins, and a reservable community facility. The basement level of the staff residence building was stripped down to bare studs following a flood in 2024. As a result, two staff bedrooms have been removed from service. PROJECT OBJECTIVE: This...

Key Requirements

  • The prime Contractor must provide a valid standard Certificate of Recognition (COR), or a valid Temporary Letter of Certification (TLC) for a standard COR, or a COR Equivalency Letter (COREL) for out of province Proponents.
Closing Deadline

Oct 22, 2026

26 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro