Services
Forestry and Parks - Request for Proposal - ENGINEERING CONSULTANT SERVICES Bow Valley Provincial Park – Water Storage and Infrastructure Assessment – South Group Campsites
Scope/Description: .1 Perform utilities infrastructure assessment, feasibility study, cost estimation, and conceptual design services for the Owl, Grouse, and Grey Jay Group Campsites within Bow Valley Provincial Park. .2 The project scope includes assessing existing potable water and wastewater infrastructure. .3 The project will develop and evaluate servicing options for potable water supply, distribution, and...
Source Summary
Opportunity Overview
Scope/Description: .1 Perform utilities infrastructure assessment, feasibility study, cost estimation, and conceptual design services for the Owl, Grouse, and Grey Jay Group Campsites within Bow Valley Provincial Park. .2 The project scope includes assessing existing potable water and wastewater infrastructure. .3 The project will develop and evaluate servicing options for potable water supply, distribution, and...
Key Requirements
- Review source documents for extracted requirements.
Oct 21, 2026
21 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro