Construction
Infrastructure - Invitation to Bid - VULCAN - PARKS WORKSHOP - Roof Replacement
Work of this Contract comprises the following: .1 Remove and dispose of existing asphalt and felt BUR membrane system and gravel protection including gypsum board on deck, asphalt vapour retarder membrane, and insulation. .2 Remove and dispose of existing roof related metal flashings and counter flashings. .3 Delete existing roof mounted antenna towers, bases, related cables, and guy wires. .4 Remove, store, and...
Source Summary
Opportunity Overview
Work of this Contract comprises the following: .1 Remove and dispose of existing asphalt and felt BUR membrane system and gravel protection including gypsum board on deck, asphalt vapour retarder membrane, and insulation. .2 Remove and dispose of existing roof related metal flashings and counter flashings. .3 Delete existing roof mounted antenna towers, bases, related cables, and guy wires. .4 Remove, store, and...
Key Requirements
- Review source documents for extracted requirements.
Nov 05, 2026
21 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro