Skip to main content
Back to RFP search

Construction

Material Disposal - Codroy NL

The work consists of the furnishing of all plant, labour, equipment and material for material disposal at Codroy, NL. In general, work under this contract will consist of, but will not necessarily be limited to, the following: 1. Removal of previously excavated/dredged material, which is currently stockpiled at the SCH main site in Codroy, NL. The disposal location for the soil is the DFO breakwater site northwest...

Open to all suppliers

Source Summary

Opportunity Overview

The work consists of the furnishing of all plant, labour, equipment and material for material disposal at Codroy, NL. In general, work under this contract will consist of, but will not necessarily be limited to, the following: 1. Removal of previously excavated/dredged material, which is currently stockpiled at the SCH main site in Codroy, NL. The disposal location for the soil is the DFO breakwater site northwest...

Key Requirements

  • Review source documents for extracted requirements.
Closing Deadline

Oct 29, 2026

13 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro