Construction
Phase 1 EZ899-270522 - Building 104 HVAC Revitalization
The scope of work is to replace existing, aged HVAC equipment. These existing systems include two (2) rooftop units and four (4) gas-fired furnaces c/w AC condensing units at Building 104, Principal entrance, at William Head Institution in Victoria, BC.
Source Summary
Opportunity Overview
The scope of work is to replace existing, aged HVAC equipment. These existing systems include two (2) rooftop units and four (4) gas-fired furnaces c/w AC condensing units at Building 104, Principal entrance, at William Head Institution in Victoria, BC.
Key Requirements
- Review source documents for extracted requirements.
Oct 19, 2026
17 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro