Skip to main content
Back to RFP search

Construction

Reconnection of Watermain Beaver Creek Institution

The Correctional Service Canada requires an experienced contractor to replace an isolated and deteriorated section of watermain and re-establish a continuous looped water distribution system at Beaver Creek Medium Institution. The work will restore normal system flow, eliminate dead-end conditions, and reduce water hammer issues within the existing water distribution network. Objectives: A section of 200 mm...

Open to all suppliers

Source Summary

Opportunity Overview

The Correctional Service Canada requires an experienced contractor to replace an isolated and deteriorated section of watermain and re-establish a continuous looped water distribution system at Beaver Creek Medium Institution. The work will restore normal system flow, eliminate dead-end conditions, and reduce water hammer issues within the existing water distribution network. Objectives: A section of 200 mm...

Key Requirements

  • Review source documents for extracted requirements.
Closing Deadline

Aug 20, 2026

15 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro