Construction
Red River Floodway Vegetation Rehabilitation & Boulder Installation
Manitoba Transportation and Infrastructure is seeking bids for vegetation rehabilitation and boulder installation along the Red River Floodway. The project includes three sections involving seeding, fence post installation, and boulder placement at specific locations along the floodway system.
AI Summary
Opportunity Overview
Manitoba Transportation and Infrastructure is seeking bids for vegetation rehabilitation and boulder installation along the Red River Floodway. The project includes three sections involving seeding, fence post installation, and boulder placement at specific locations along the floodway system.
Key Requirements
- seeding of designated areas
- installation of fence posts
- supply and installation of boulders
- section 1 perimeter drain work
- section 2 west dike work
- section 3 inlet control structure work
Oct 07, 2026
8 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro