Research Microgrid Controller and Equipment Integration
Red River College is seeking proposals to design, supply, configure, integrate, test, commission, and provide ongoing support for a behind-the-meter microgrid research testbed at the Notre Dame Campus. The project involves four coordinated equipment packages including a microgrid controller, AC distribution panel, programmable load units, and battery energy storage system for applied research purposes.
AI Summary
Opportunity Overview
Red River College is seeking proposals to design, supply, configure, integrate, test, commission, and provide ongoing support for a behind-the-meter microgrid research testbed at the Notre Dame Campus. The project involves four coordinated equipment packages including a microgrid controller, AC distribution panel, programmable load units, and battery energy storage system for applied research purposes.
Key Requirements
- Design and supply of industrial microgrid controller and HMI/SCADA platform
- Integration of AC distribution panel with protective devices and metering
- Procurement of programmable electronic load units
- Installation of battery energy storage system with PCS and BMS
- Testing and commissioning of microgrid components
- Training and ongoing support services
Sep 14, 2026
8 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro