Construction
Rip-Rap Placement at Multiple Bridge Sites
Manitoba Transportation and Infrastructure requires rip-rap placement and supply for multiple bridge and culvert sites across several highways. The work involves geotextile installation and material placement at five distinct locations north of Duck Mountain.
AI Summary
Opportunity Overview
Manitoba Transportation and Infrastructure requires rip-rap placement and supply for multiple bridge and culvert sites across several highways. The work involves geotextile installation and material placement at five distinct locations north of Duck Mountain.
Key Requirements
- Supply and placement of rip-rap
Oct 14, 2026
15 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro