Skip to main content
Back to RFP search

Public sector

RIP-RAP PLACEMENT AT VARIOUS BRIDGE & CULVERT SITES SOUTH OF DUCK MOUNTAIN

SECTION I Rip-Rap placement at the existing reinforced concrete box culvert on PTH 10 over Pine Creek located in the RM of Mountain, approximately 1.9 km south of PR 271, Bridge Site No.: 1513-00 SECTION II Rip-Rap placement on the existing bridge over Birdtail Creek, Tributary on PR 254, located in the RM of Rossburn, approximately 7.3 km east of PR 476, Bridge Site No.: 4345-10 SECTION III Rip-Rap placement on...

Open to all suppliers

Source Summary

Opportunity Overview

SECTION I Rip-Rap placement at the existing reinforced concrete box culvert on PTH 10 over Pine Creek located in the RM of Mountain, approximately 1.9 km south of PR 271, Bridge Site No.: 1513-00 SECTION II Rip-Rap placement on the existing bridge over Birdtail Creek, Tributary on PR 254, located in the RM of Rossburn, approximately 7.3 km east of PR 476, Bridge Site No.: 4345-10 SECTION III Rip-Rap placement on...

Key Requirements

  • Review source documents for extracted requirements.
Closing Deadline

Oct 02, 2026

13 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro