BUILDING SOLAR HEATING SYSTEMS - INSTALLATION AND REPAIR
Solar PV Power Generation System Installation
The City of Fredericton seeks proposals to install a solar PV power generation system on the roof of the Marysville Outdoor Pool Building. The project requires a minimum 20kWdc and maximum 30kWdc system connected to the existing electrical system and grid via NB Power's net metering agreement.
AI Summary
Opportunity Overview
The City of Fredericton seeks proposals to install a solar PV power generation system on the roof of the Marysville Outdoor Pool Building. The project requires a minimum 20kWdc and maximum 30kWdc system connected to the existing electrical system and grid via NB Power's net metering agreement.
Key Requirements
- Mandatory site visit by September 29, 2026
- 20kWdc to 30kWdc system capacity
- Grid connection via NB Power's net metering agreement
Oct 08, 2026
15 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro