Construction
Stage 2- 2026 Lake Louise Annex Compound Roof Replacement, Banff National Park
5P468-26-0149/A Stage 2- 2026 Lake Louise Annex Compound Roof Replacement, Banff National Park REQUIREMENT Parks Canada requires a new roof on our Lake Louise Annex Compound building (roughly 9,120 square feet). The Roof will need to be removed down to the structural decking and replaced with a modified 2-ply bitumen flat roof system including insulation, vapour barrier and replacing all flashings, vents and...
Source Summary
Opportunity Overview
5P468-26-0149/A Stage 2- 2026 Lake Louise Annex Compound Roof Replacement, Banff National Park REQUIREMENT Parks Canada requires a new roof on our Lake Louise Annex Compound building (roughly 9,120 square feet). The Roof will need to be removed down to the structural decking and replaced with a modified 2-ply bitumen flat roof system including insulation, vapour barrier and replacing all flashings, vents and...
Key Requirements
- Review source documents for extracted requirements.
Oct 08, 2026
15 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro