Services
Pallet Racking, Mezzanine, and Warehouse Partition Installation
The Government of Ontario is seeking bids for the supply, engineering, delivery, and installation of an integrated storage system in a new museum storage facility. The project includes industrial pallet racking, a mezzanine, and a security partition designed to accommodate diverse museum artifacts with specific size, weight, and configuration requirements.
AI Summary
Opportunity Overview
The Government of Ontario is seeking bids for the supply, engineering, delivery, and installation of an integrated storage system in a new museum storage facility. The project includes industrial pallet racking, a mezzanine, and a security partition designed to accommodate diverse museum artifacts with specific size, weight, and configuration requirements.
Key Requirements
- Supply, engineering, delivery, and installation of integrated storage system
- Structural components and anchoring
- Shop drawings and load information
- Engineering documentation
- Customized solutions for varied artefact sizes and weights
- Compliance with unheated facility requirements
Nov 24, 2026
38 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro