Services
Utilities Master Plan Update Request
The Town of Peace River requires professional engineering consulting services to update its 2010 Utility Master Plan for the water distribution system. The project involves assessing existing infrastructure, calibrating hydraulic models, evaluating capacity needs, identifying deficiencies, and developing a 15-year capital improvement plan.
AI Summary
Opportunity Overview
The Town of Peace River requires professional engineering consulting services to update its 2010 Utility Master Plan for the water distribution system. The project involves assessing existing infrastructure, calibrating hydraulic models, evaluating capacity needs, identifying deficiencies, and developing a 15-year capital improvement plan.
Key Requirements
- Examine existing infrastructure capacity and functionality.
- Determine existing system capacity and ability to support future development.
- Determine current demands, system condition and regulatory requirements.
- Review available planning information.
- Evaluate and prioritize improvements to existing infrastructure.
- Evaluate future demands based on projected development, growth patterns and population projections.
- Provide conceptual design requirements and cost estimates for identified deficiencies. Provide an updated water distribution system model. Provide boundary design conditions for new development areas.
- Develop a 15-year capital improvement plan with priorities and triggers for improvements. Provide guidance on operation and maintenance of existing infrastructure.
- Provide draft and final reports and all collected project data.
Sep 16, 2026
10 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro