Construction
Whitby South Shore Protection
The work under this contract includes approximately 100m of shoreline restoration including, but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of...
Source Summary
Opportunity Overview
The work under this contract includes approximately 100m of shoreline restoration including, but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of...
Key Requirements
- Review source documents for extracted requirements.
Oct 07, 2026
12 days remaining
Not disclosed
Estimate
Full contract details is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to ProAI Bid Analysis is a Pro feature
Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.
Upgrade to Pro