Skip to main content
Back to RFP search

Construction

Whitby South Shore Protection

The work under this contract includes approximately 100m of shoreline restoration including, but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of...

Open to all suppliers

Source Summary

Opportunity Overview

The work under this contract includes approximately 100m of shoreline restoration including, but not limited to: 1. Excavation and removal and disposal of native soil to specified limits; 2. Clearing and grubbing of existing trees in the work area; 3. Relocation of existing trees; 4. Introduction of a new swale; 5. Addition of a new rock berm; 6. .Removal of wharf timber superstructures; 7. Transportation of...

Key Requirements

  • Review source documents for extracted requirements.
Closing Deadline

Oct 07, 2026

12 days remaining

Estimated Value

Not disclosed

Estimate

Full contract details is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro

AI Bid Analysis is a Pro feature

Upgrade for full contract details, procurement contacts, documents, and AI bid analysis.

Upgrade to Pro